Cut down hedge, grub up roots and remove height, 1500mm m height, 3000mm m

Excavate topsoil or turf and lay aside for re-use

150mm thick m2

200mm thick m2

250mm thick m2

Excavate to reduce levels depth not exceeding

250mm thick m3

500mm thick m3

Extra for excavating through rock m3

concrete m3

brickwork m3

Unit Labour

Excavate trench for kerb foundation

200 x 75mm thick m 0.10

250 x 100mm thick m 0.12

300 x 100mm thick m 0.14

450 x 500mm thick m 0.20

  1. 36 - 2.60 19.96
  2. 40 - 4.56 34.96
  3. 33 - 0.05 0.38
  4. 44 - 0.07 0.51
  5. 54 - 0.08 0.62
  6. 62 - 0.24 1.86
  7. 52 - 0.23 1.75
  8. 65 - 10.75 82.40
  9. 80 - 9.12 69.92
  10. 76 - 7.16 54.92

Hours Mat'ls O & P Total

£ £ £ £

  1. 50 - 0.23 1.73
  2. 80 - 0.27 2.07
  3. 10 - 0.32 2.42
  4. 00 - 0.45 3.45

Total

Disposal by machine

Load surplus excavated material into lorries and cart away to tip distance, 10km m3 17.96

distance, 15km m3 19.54

Filling by machine

Surplus excavated material deposited and compacted in layers over 250mm thick m3 7.84

100mm thick m2 1.20

150mm thick m2 1.35

200mm thick m2 1.50