Info

Total

Total

£

£

£

£

450mm, depth

1.5-2m

m

38.14

20.34

8.77

67.25

2-2.5m

m

40.22

20.34

9.08

69.64

2.5-3m

m

44.85

20.34

9.78

74.97

600mm, depth

1.5-2m

m

58.76

32.20

13.64

104.60

2-2.5m

m

66.00

32.20

14.73

112.93

2.5 -3m

m

73.20

32.20

15.81

121.21

ioncrete pipe fittings,

nominal bore

300mm

bends, 45 degrees

nr

11.58

114.51

18.91

145.00

junctions

nr

14.38

88.49

15.43

118.30

450mm

bends, 45 degrees

nr

14.46

168.55

27.45

210.46

junctions

nr

20.32

114.56

20.23

155.11

600mm

bends, 45 degrees

nr

18.37

384.25

60.39

463.01

junctions

nr

28.57

114.56

21.47

164.60

HOUSE FOUNDATIONS Hand excavation

Excavate topsoil

150mm thick

m2

0.35

5.25 -

0.79

6.04

200mm thick

m2

0.45

6.75 -

1.01

7.76

250mm thick

m2

0.60

9.00 -

1.35

10.35

Excavate to reduce levels, levels, depth not exceeding

0.75m

m3

2.20

33.00 -

4.95

37.95

1.00m

m3

2.40

36.00 -

5.40

41.40

1.50m

m3

2.80

42.00 -

6.30

48.30

2.00m

m3

3.20

48.00 -

7.20

55.20

Excavate trenches 450mm wide,depth not exceeding

0.75m

m3

2.50

37.50 -

5.63

43.13

1.00m

m3

2.70

40.50 -

6.08

46.58

1.50m

m3

3.00

45.00 -

6.75

51.75

2.00m

m3

3.40

51.00 -

7.65

58.65

Extra for excavating through

rock

m3

10.00

150.00

- 22.50

172.50

concrete

m3

8.00

120.00

- 18.00

138.00

reinforced concrete

m3

9.00

135.00

- 20.25

155.25

brickwork

m3

6.00

90.00

- 13.50

103.50

Excavate by machine

Excavate topsoil

150mm thick m2

200mm thick m2

250mm thick m2

Excavate to reduce levels, levels, depth not exceeding

0.75m m3

1.00m m3

1.50m m3

2.00m m3

Excavate trenches 450mm wide, depth not exceeding

0.75m m3

1.00m m3

1.50m m3

2.00m m3

Extra for excavating through rock m3

concrete m3

reinforced concrete m3

brickwork m3